02 / 06Capabilities

Engagement types and boundaries.

Compare evidence and frame the project scope
Capabilities / engagement design

Not a test list. A decision structure.

Inputs, methods, outputs, and boundaries are read in one specification frame.

Inputs
Material, origin, reference
Output
Conformance note
Working boundary
Scope is reviewed before any reading.
Two analysts arrange botanical vials and inspect samples at an ingredient laboratory bench.
Select service path
Working boundary

We do not replace regulatory validation, certification, or safety testing outside a reviewed scope.

Build a scope