Skip to content
Project directory06 rooms

Browser-based review

Indonesia + Southeast Asia

Room 00 / Product

Spatial architecture collaboration, room by room.

Bring models, issues, field evidence, and decisions into one view the whole project team can understand.

For architecture teams, project partners, and individual reviewers Indonesia and Southeast Asia · online or by appointment

Next: Workspace
Teras TengahRevision 18

Review open

Teras Tengah project working viewL02 / AtriumPRX-018 / OpenPRX-021 / In review

Federated model / 4 disciplines / updated today

02Two issues sit in this view
  1. PRX-018 / OpenDuct route meets beam at east corridor

    MEP · L02 · East corridor

  2. PRX-021 / In reviewDoor threshold width awaits access decision

    Architecture · L02 · Room 2.14

  1. 01Model publishedComplete
  2. 02Discipline checkComplete
  3. 03Team reviewActive
  4. 04Decision recordedNext

Model view active

Two architects compare a sectional building model with an abstract spatial view in a daylight studio.
Operating context

Physical models and spatial views work together so each decision remains traceable to the real space.

01Room 01 / WorkspaceEnter room

Room 01 / Workspace

Project objects stay in context.

The federated model is the main room. Versions, issues, decisions, and field evidence attach to the exact level, zone, and element.

Views
Model, issues, sequence, and field evidence
Trail
Revisions, decisions, status, and responsibility
Access
Core roles, guests, and review links
Devices
Browser, tablet, and review room

Room 02 / Workflows

Every role sees the next handoff.

Inputs, ownership, exceptions, and outcomes are arranged as an inspectable route, not a feature list.

Three architects discuss a timber and acrylic building model during a focused review.
Team review

A studio review connects the model, materials, and room choices before work moves forward.

  1. 01
    Lead design

    Publish a view and frame the decision.

  2. 02
    Coordinate

    Locate conflicts, add context, route the action.

  3. 03
    Review

    Compare options in an understandable view.

  4. 04
    Check the field

    Attach an observation to its level and zone.

Room 03 / System

Project boundaries stay visible.

Access roles, version history, export ownership, and design-tool connections are written as inspectable operating rules.

A tactile nested-room model uses timber, grey board, felt, and colored acrylic to connect eight spaces.
Room system

The nested-room model gives boundaries, thresholds, and information routes one tactile language.

Boundary
One workspace per project and defined project team
History
Versions and decisions remain in sequence
Connections
Models, documents, and issues enter through project connectors

Room 04 / Plans

Choose scope for the project rhythm.

Reviewer access, studio workspaces, and portfolio scope differ by project count, history, administration, and support.

Four project participants compare room modules and place a selected option into an architectural model.
Decision session

A decision session uses the same model and material choices as the digital project room.

Viewer
Invitation access to view and comment
Studio
1 workspace · up to 20 members · IDR 4.8m/month
Portfolio
5 workspaces · cross-project admin · from IDR 13.5m/month

Room 05 / Configure

Prepare a view before choosing access.

Choose a scenario, emphasis, density, and guest visibility. The summary applies only to the current tab.

Configure now

00—05

Enter through the project directory

Six rooms follow an ordinary working order: understand the product, open the workspace, inspect workflows, review the system, compare plans, then configure.