Evidence
Enough evidence to decide. Clear limits on what it can prove.
Climate advice earns trust by connecting source, reading, architectural consequence, assumption, and ownership of the next check.

A facade section can expose shade depth, ventilation layers, drainage, material build-up, and the questions still open.
01Evidence dossier
A disciplined line from condition to decision.
Not every project needs the same analysis. We select only the evidence required to understand a design choice and its uncertainty.
SourceWhat it helps readDesign consequenceLimit
Climate + siteSun exposure, wind opportunity, rainfall, landscape, adjacencyOrientation, massing, thresholds, shade, water pathsEarly evidence does not replace measured local conditions or specialist surveys.
Geometry + useRoom depth, openings, occupancy, schedules, circulationVentilation routes, daylight access, zoning, operating modesResults depend on the design inputs and operating assumptions supplied.
Envelope + materialShade depth, porosity, build-up, weathering, maintenanceFacade family, mock-up focus, detail priorities, substitutionsProduct performance and compliance require manufacturer and appointed-specialist evidence.

Physical models, material samples, overlays, and a decision record are assembled around one project question.
Working outputs
The package should remain useful after the meeting.
A clear record lets the project team see what was compared, why a direction moved forward, what remains uncertain, and when the decision should be checked again.
- 01Decision register
- Chosen direction, alternatives considered, assumptions, and next owner.
- 02Marked-up evidence
- Drawings, models, images, or analyses annotated around the project question.
- 03Climate intent
- A concise narrative that other disciplines and operators can carry forward.
- 04Open checks
- Questions that require survey, engineering, mock-up, commissioning, or operational evidence.